Works: Steel Fixing and Form work Carpentry Works
Typology: Structural Works
Site: Al Saad Sports Club
Client: Al Saad Sports Club - Qatar Olympic Committee
Contractor: AKTOR S.A.
Project Duration: Apr. 2013 - Sept. 2014
An Olympic multipurpose hall for handball, basketball, volley ball, badminton, rhythmic gymnastics and international ice rink sports, compliant with local and international federation standards.
​
The building has 1 basement and 4 floors above ground plus catwalk floors with a free height of 34m and free span opening of 105m. The building comprises 45,200 m3 concrete and 2,300 tons of steel structure at the roof level.
​
The main arena building is on a plot of approximately 16,000 m2 and consists of a fully integrated air conditioned main field of play courts for basketball, volleyball, handball, badminton and rhythmic gymnastics, with seating for 8,524 spectators, and with all relevant supporting facilities and spaces.
​
The facility includes two warm-up halls with retractable seating, separate player, spectator, press and VIP entrances, and dedicated external car parking.
![]() |
---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |