Works: Formworks and Rebar Installation
Typology: Structural Works
Site: Al Thumama Super Qatar Power Transmission System, Expansion Phase XI, Substation
Client: Siemens
Contractor: Gulf Contracting Co. W.L.L
Project Duration: Apr.2013 - Dec.2013
The new Al Thumama substation serves the new fast developing residential area at Al Thumama by transferring bulk power from 609 MW Ras Abu Fontas B and 2,000 MW Messaieed Power Generation Plants.
The vital substation also connects to Doha South Super as well, which is the interconnection point of the GCC grid.
The new extra high voltage cables buried underground cover more than 54 kilometres of the areas previously covered by the OHLs linked to Ras Abu Fontas A, Ras Abu Fontas B, Al Wukair Super and Al Wakra sub-stations.
Source: Gulf Times
![]() |
---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |